By plan
Confirm qualified personnel, supervision, lifting aids and the approved sequence.
Review the approved drawings, packing plan, local crew, tools and site conditions before committing to an installation programme.
Modular assembly depends on the selected mechanism, appliance scope, approved BOM and local conditions. Request the configuration-specific assembly guidance and any relevant controlled records; no generic crew size or completion time is promised.
Confirm qualified personnel, supervision, lifting aids and the approved sequence.
Confirm the programme against the issued assembly guidance and actual site requirements.

Four units cycling open together at an independent manufacturing partner, shown at 4x playback speed. The recording is a function-check example. Mechanism, equipment and layout are confirmed for each project.
Four units open together in one recorded pass at an independent manufacturing partner, shown at 4x playback speed. It demonstrates a function check, not a promised cycle time.
No customer, order or shipment identifiers are shown. Audio has been removed. The clip is not proof of a specific order, shipment or certification.
Pair this recording with the approved drawings, BOM and order-specific inspection records before treating any movement as accepted for a project.
Structural sections, cabinetry, finish panels, worktop and approved components can be assembled against controlled drawings and a defined sequence.
The configuration-specific sequence, local resources and site conditions provide the basis for labour and access planning before a modular shipment is approved.
The issued guide, approved BOM, drawings, packing list and configuration-specific instructions govern the supplied unit.
| Variable | Why the site result can differ |
|---|---|
| Unloading and access | Container position, doorway clearance, travel path, lifting equipment and package handling are site-specific. |
| Crew capability | Installer familiarity, supervision, tools and local safe-working requirements affect duration. |
| Configuration | Appliance scope, lift mechanisms, finishes, worktops, optional components and interface details vary by approved BOM. |
| Foundations and utilities | Base preparation, anchoring, gas, electrical, water, drainage and local commissioning are not included in the recorded factory assembly time. |
| Weather and regulation | Outdoor conditions, permits, inspections and licensed-trade requirements can change the site programme. |
Send the destination, model, delivery format, site access, local crew capability and appliance market.
Request an assembly validation review