Assembly time and crew are confirmed for the selected configuration, approved drawings, access, unloading, lifting equipment and installer capability. Factory assembly guidance does not include foundations, licensed utility connections or local commissioning.
| Planning area | What must be confirmed |
|---|---|
| Structure and materials | PRO/MAX galvanized-steel frame or CUSTOM Compact aluminium frame, with component-specific panels and stainless-steel worktop/sink as confirmed in the approved BOM. |
| Interfaces | Applicable supplied electrical interfaces use keyed connectors designed to reduce incorrect mating; voltage, connector and component scope remain order-specific. |
| Handling | Package access, unloading method, crew, tools, lifting aids, safe work area and component weights. |
| Final utilities | Gas, electrical, water and drainage connections completed or verified by appropriately licensed local trades where required. |
Typical control sequence
- Inspect packages and record visible transit damage.
- Identify components against the packing list and approved drawings.
- Position, connect, level and secure structural sections.
- Install upper assemblies using the confirmed lifting plan.
- Install cabinet, finish-panel, worktop and approved appliance components.
- Complete mechanical and supplied-component function checks.
- Arrange regulated utility connections and local commissioning.
The issued assembly guide, approved BOM, drawings and order-specific document index govern the supplied configuration.